Wednesday, September 5, 2007

Plumbing The Upstairs Part 1 9-01-07

Hello again! Today we started working on the upstairs plumbing (Drain Pipes)

This the backside of the old bathroom which we decided to leave for now. My plan was to redo this but we decided we would like to have a working toilet & shower ASAP instead.

I had to cut out for the 3" drain that will run along the back wall. This seemed simple enough. Yeah right! I keep telling myself you have to remember things very rarely workout easy.



Thanks Jen for capturing the moment of, Oh Great!

This shower hookup will prove to be a real pain by the end of this day.



This is where the vent connects with the 3" drain.
This is also where the kitchen sink drain will be hooked into.



To the right of the picture is the bathroom sink drain and to the left is the toilet drain.
When this bathroom was first built it was plumbed in the first floor ceiling area. Since there was a drop-in ceiling it was never seen.

I wanted to make sure that everything was re-run the original way and this is the corrected way with this later addition bathroom.



Here I am adding the drain for the bathroom sink.

At least I don't have the plumber's crack!




The toilet drain with the upturned 90.
Almost ready for use!




Kitchen, bathroom sink and toilet drains finished.




Picture of Jen goofing around again.
She can't expect me not to put these on the blog.
Maybe someday she will learn.




Well this is the end of our day of plumbing.

Gatorade! I live on this stuff when I am working on this building.

Sorry Gatorade! I forgot to turn the label so I could give you a proper plug.
I really doubt they care about my little blog.

Later,
Chris & Jen

1 comment:

Anonymous said...

Jen Here: I wasn't goofing around, I was on a labor strike because I was missing the Mizzou football opener v. Illinois!